From: route@monster.com
Sent: Friday, April 08, 2016 12:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
MUKESH
SAWLANI, PMP® Add: 908
Liberty Street, Apt 3
Mobile:
(415)601-8148
El Cerrito, CA
94530
email:sawlani.mukesh@gmail.com
Master of Science:
Construction Management Texas A & M
University
Overall GPA: 3.67/4.0 Graduated: Summer
2007 Research Paper: Analyze the
delivery system used within school districts for the Construction of
Educational Buildings for effectiveness of cost and time against performance
baseline. Related Electives: Advanced Scheduling
(Primavera P5, MS Project)
EPC (Engineering Procurement and Construction)
OSHA 30 hours (Construction Safety)
Business Management and Accounting Bachelors of
Architecture (Honors) University of
Mumbai (Bombay),
India
Overall GPA: 3.73/4.0 Date of Graduation:
May 2003
·
Scheduling
software
: Primavera P3, P6.7, MS Project 2003 ·
Project
Control
Software
: Contract Manager( Expedition) ·
Take
off Software
: On Screen Takeoff, Site WorxOS, Autodesk Takeoff, and Digitizer. ·
Design
Software
Packages
: AutoCAD 2007, Revit9, 3 D Studio Max, Photo shop, Corel Draw. ·
Estimation
Software
: RS Means, Timberline, MC2.
·
MS
Office
: Excel( Advanced Lvl), Word, Power point, Outlook, Publisher, Access
·
Project Planning -- Logistics, Risk
Assessment and Scheduling ·
Preconstruction -- Estimating, Scoping Work
and Reviewing Bids ·
Risk Management -- Subcontract/Scope Writing,
Decision-Making and Evaluation ·
Team Leadership -- Client, Subcontractor and
Project Team Direction and Communication ·
Design Management -- Develop Collaborative
Solutions ·
Cost Control -- Pay Application Review,
Change Orders ,General Conditions, Budget Analysis & Tracking ·
Field -- Direction, Coordination ·
Inspections-- Implement Inspection
Requirements, Coordinate 3rd Party Inspections & Ensure Compliance ·
Training -- Train Core Processes and Project
Management Methods to Project Team ·
Develop and implement the Work Breakdown
Structure, flowchart, Work Item Lists, CPM Timetable, Preliminary Master
Schedule, CPM development, resource and costs analysis and reports ·
Update schedule and verify the Critical path
and develop a strategy to adhere to baseline/ determine impacts. ·
Risk assessment along with developments in
the project phases and accounting for residual. ·
Identify significant schedule risks to
Division and Operations personnel ·
Prepare progress reports, including progress
percent calculation for the assigned Work Breakdown Structure (WBS) Elements. ·
Master Schedule, CPM Time-scaled Logic; Short
Term Schedule report, Look ahead schedule ·
Generating Reports for Activities with Early
and late dates, floats as per contract, histogram and curves for resource
availability and requirement. ·
Assist Department for Close out notices,
historical project data sheet, duration’s data sheet, man power and cash flow
information, procurement lead time data ·
Construction Estimates in different formats
as per clients request (CSI, Uni format, Functional) for City San Francisco,
California Correction Facility. ·
Developed Master Estimating Formats for Federal
agencies as per program requirements. ·
Cost Variance reports, Estimate
Reconciliation and documenting approach. ·
Generation of EV, Variance, performance,
progress, forecast reports. ·
Value Engineering; Value Analysis with Design
team on alternative approach. ·
Assure that all aspects of the project are
captured and/or specifically excluded. ·
Identify
elements posing risk to estimate/ Schedule and suggest a response to mitigate
risk, track it or have contingency built for the same. ·
Change
order negotiation lead, evaluations for the cost and time impact, warranty
conflicts; negotiations to avoid claims. ·
Account
for current Cost Performance Index and forecast cost. ·
Cost Analyst for Parsons, Kennedy Jenks, CDM,
Jacobs, HKIT, DMJM and many Architectural firms. DACM Construction
Management:
Jan 2010-Till day ·
Sr.
Program Analyst (Scheduler/ Estimator, West Contra Costa Unified School
District $12 BN Capital Bond Program) Overall more than 150
project from Modernization, Interim Housing, and Replacement Campus for
Phasing and in accordance with Annual Budgets on Bonds · High Schools: De Anza,
Richmond, Kennedy, El Cerrito, · Middle Schools: Pinole, Pinole
Valley View, Portola, Crespi · Elementary Schools: Stege, Fairmont,
Lupine, Verde, Mira Vista, Hana Ranch, Madera, Nystrom, Peres, Washington,
Woodrow Wilson, Ohlone, Riverside Saylor Consulting
Group:
Oct 2007-Jan 2010
Sr. Cost Analyst List of few Major
Projects: Water Improvement
Program (SFPUC): Crystal
Springs ($55.6 MN), Bay Division ($61.5MN, $56.8MN for East Bay and Peninsula
reaches respectively), San Andreas # 3 ( $16.4 MN, Includes vault upgrades),
San Joaquin System ($18.9 MN), Noe Valley Transmission Phase II ($5.6
MN),Calaveras Dam ($3.9 BN) @ 65 % design., Harry Tracy Water Treatment Plant
($3.9 BN) ( Pipeline System included Pipeline, Pump Stations, Filtration
System, SCADA, Transmission, Substation, Special Equipment’s, Directional
Horizontal Boring, Large Prefabricated Tanks, Pile Drilling, Shoring, Soil
Stabilizations, Miscellaneous Custom Fabrication to support the system) Airports: Sacramento Airport
(Landside Roads and Infrastructure, Elevated Rail Transit, Baggage, Security
$1.4 BN), John Wayne, McCarran Heliport NV (Hangars, Fuel Farms, Control
Station, $52 MN), San Francisco Airport Modernization Mixed Bag: K12 Education
Buildings, LEED (Gold, Silver certified Building), LBNL (Lawrence Berkeley
National Laboratory), Casino Arizona Pre Claims Resolution, LA Unified School
district, Fire Stations, Bus Maintenance Facility, Medical Facilities,
Theatre, Historical Restoration, Caltrans Retrofitting and High Security
Correctional Facilities, Noe Valley Gas Line Replacement, San Francisco
General Hospital, BART (Bay Area Rapid Transit) Extension Feasibility, Sub
Sea work Extension of Pier, NUMMI (Toyota Plant Options) ARRIS Architects:
June2004-Apr 2005 (Associate
Architect) ·
Fun
Republic (Multiplex),
Lucknow, India. ( $ 7 million)
Responsibility:
Responsible for preparing bid documents, determine conflicts when modeling with
HVAC and structural consultants, incorporating owner driven design
changes ·
Valentine
Cinevision (Multiplex),
Surat, India. ( $ 3 million) Responsibility: Responsible for
daily work logs and entries, managing field crews, safety, tracking owner and
architect driven design changes. ·
Fun
Republic (Multiplex),
Andheri, Mumbai, India. ( $ 12 million)
Responsibility:
Responsible for designing interior spaces for cafeteria, getting the permits,
estimation and scheduling, subcontracting, working drawings. ·
E
Funds (Commercial
Office Space), Andheri, Mumbai, India. ($ 2 million)
Responsibility: Responsible for designing the interiors, estimation,
scheduling, progress reports, execution on the site, working drawings,
analyzing the use of resource.
L K ASSOCIATES (Designer and Structural
Consultant)
November
2002-April 2004
Intern & Jr. Project Architect · LIC Housing (Housing Complex),
Ahmednagar, India. ( $ 4 million)
Responsibility:
Responsible for designing layouts, Procurement, purchasing and
sub-contracting. Swami Dev Prakash
Gardens
(High Rise Building), Ambernath, India. ($ 3.5 million) Responsibility: Responsible for
daily work logs and entries, managing field crews, quality control, safety,
incorporating owner and architect driven design changes.
· Best employee of
the year Bonus award with Saylor Consulting · Member of winning
team at NASA (National Association Of students Architecture) for Rubens
Trophy 2000, Best logo design for ETID department at TAMU.
·
Project Management Professional ( PMP Certified)
·
American Society of Professional Estimators
(ASPE)
·
Construction Management Association of America(
CMAA)
· International
Facility Management
Association(IFMA)
·
Council of Architecture(COA),
India
· Gennady Kertsman-
PM at SCG
gkertsman@saylorconsulting.com · Alfred Louie,
(415)225-9220
alfred.louie@gmail.com · Seth Danquah- PM at
SCG
sdanquah@saylorconsulting.com · Karim
Nassab
knassab@sgicm.com · More
reference from President, Director of Program, and District Superintendent
can be provided on request.
|
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|